{"id":3903,"date":"2022-03-07T08:24:00","date_gmt":"2022-03-07T08:24:00","guid":{"rendered":"https:\/\/www.mae.gov.bi\/en\/?p=3903"},"modified":"2022-03-23T08:31:40","modified_gmt":"2022-03-23T08:31:40","slug":"a-tripartite-ministerial-meeting-between-burundi-tanzania-and-the-democratic-republic-of-congo","status":"publish","type":"post","link":"https:\/\/www.mae.gov.bi\/en\/a-tripartite-ministerial-meeting-between-burundi-tanzania-and-the-democratic-republic-of-congo\/","title":{"rendered":"A tripartite ministerial meeting between Burundi, Tanzania and the Democratic Republic of Congo"},"content":{"rendered":"<p style=\"text-align: justify;\">A tripartite ministerial meeting was held in Tanzania in Dar es Salaam between Burundi, Tanzania and the Democratic Republic of Congo on March 06, 2022. This meeting brought together the Ministers of Transport, Infrastructure and Finance and ended in Dar es Salaam by signing a memorandum of understanding on the construction project of the SGR railway: Uvinza-Musongati-Gitega and DRC.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3904\" src=\"https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FINANCE-1-300x207.jpg\" alt=\"\" width=\"300\" height=\"207\" srcset=\"https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FINANCE-1-300x207.jpg 300w, https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FINANCE-1-768x530.jpg 768w, https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FINANCE-1-110x75.jpg 110w, https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FINANCE-1.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-3856\" src=\"https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FIN-300x186.jpg\" alt=\"\" width=\"333\" height=\"206\" srcset=\"https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FIN-300x186.jpg 300w, https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FIN-768x477.jpg 768w, https:\/\/www.mae.gov.bi\/en\/wp-content\/uploads\/2022\/03\/FIN.jpg 1024w\" sizes=\"auto, (max-width: 333px) 100vw, 333px\" \/><\/p>\n<p style=\"text-align: justify;\">This meeting was preceded by another of the Technicians \/ Experts which was held from March 5 to 6 to prepare the editing of the documents signed on March 6, 2022 by the Ministers. The work consisted of revising the Tripartite Memorandum; revision of the Uvinza-Musongati and Gitega section; the development of the updated roadmap by the tripartite and approval of the terms of reference for the recruitment of consultants for the second phase: Gitega-Bujumbura and Unira Kindu and the agreement to publish the tender file.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A tripartite ministerial meeting was held in Tanzania in Dar es Salaam between Burundi, Tanzania and the Democratic Republic of Congo on March 06, 2022. This meeting brought together the Ministers of Transport, Infrastructure and Finance and ended in Dar es Salaam by signing a memorandum of understanding on the construction project of the SGR &hellip;<\/p>\n","protected":false},"author":1,"featured_media":3856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-3903","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news"],"_links":{"self":[{"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/posts\/3903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/comments?post=3903"}],"version-history":[{"count":2,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/posts\/3903\/revisions"}],"predecessor-version":[{"id":3908,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/posts\/3903\/revisions\/3908"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/media\/3856"}],"wp:attachment":[{"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/media?parent=3903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/categories?post=3903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mae.gov.bi\/en\/wp-json\/wp\/v2\/tags?post=3903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}